Documente tehnice
Specificatii
Marca
Schneider ElectricManufacturer k.i.m.
Schneider Electric
Better World Product (Afla mai multe)
Yes
Inaltime
16.5mm
Adancime
43mm
Frecventa minima de auto-rezonanta
-25°C
Timp montare
Plug-On Mount
Better World Verification
Green Premium
Temperatura maxima de lucru
+60°C
Tensiunea de alimentare
200 → 240V ac
Raza actiune
Acti 9
Latime
18mm
Curent nominal
63A
Wired/Wireless
Wireless
Protectie IP
IP20
Consum energie
1VA
Utilizare cu
Acti 9 iC65, Acti 9 iID, Acti 9 iID K, Acti 9 iK60, Acti 9 iKQ, Acti 9 iKQE RCBO, Acti 9 K60, Acti 9 Reflex iC60, Acti 9 Single Terminal iC60, Multi 9 C32N, Multi 9 C60, Multi 9 C65, Multi 9 ID
Detalii produs
Acti9 PowerTag Energy Sensor
The Acti 9 Smartlink system is used to monitor the final distribution boards to any supervision system.
Modular Acti 9 devices in the Acti 9 Smartlink system are used to monitor, and measure the electrical distribution boards via a Modbus TCP/IP communication network.
The Acti 9 Smartlink system collects the data from electrical distribution boards in real time, thus contributing to achieve efficiency targets or monitoring final loads.
Informatii indisponibile despre stoc
Incercati din nou mai tarziu
€ 193,42
Buc. (fara TVA)
€ 230,17
Buc. (cu TVA)
1
€ 193,42
Buc. (fara TVA)
€ 230,17
Buc. (cu TVA)
1
Documente tehnice
Specificatii
Marca
Schneider ElectricManufacturer k.i.m.
Schneider Electric
Better World Product (Afla mai multe)
Yes
Inaltime
16.5mm
Adancime
43mm
Frecventa minima de auto-rezonanta
-25°C
Timp montare
Plug-On Mount
Better World Verification
Green Premium
Temperatura maxima de lucru
+60°C
Tensiunea de alimentare
200 → 240V ac
Raza actiune
Acti 9
Latime
18mm
Curent nominal
63A
Wired/Wireless
Wireless
Protectie IP
IP20
Consum energie
1VA
Utilizare cu
Acti 9 iC65, Acti 9 iID, Acti 9 iID K, Acti 9 iK60, Acti 9 iKQ, Acti 9 iKQE RCBO, Acti 9 K60, Acti 9 Reflex iC60, Acti 9 Single Terminal iC60, Multi 9 C32N, Multi 9 C60, Multi 9 C65, Multi 9 ID
Detalii produs
Acti9 PowerTag Energy Sensor
The Acti 9 Smartlink system is used to monitor the final distribution boards to any supervision system.
Modular Acti 9 devices in the Acti 9 Smartlink system are used to monitor, and measure the electrical distribution boards via a Modbus TCP/IP communication network.
The Acti 9 Smartlink system collects the data from electrical distribution boards in real time, thus contributing to achieve efficiency targets or monitoring final loads.